arrow
返回

4PL routing problem using hybrid beetle swarm optimization

delete2023-05-23
delete28
delete
OA
AI
F
Fuqiang Lu *
陈
陈卫东 (Weidong Chen)
W
Wenjing Feng
H
Hualing Bi
DOI:10.1007/s00500-023-08378-4delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
From the view of comprehensive consideration, this considers the uncertainty of transportation time and cost due to seasonality and human factors, and a multi-objective chance constrained programming model with minimum transportation time and cost was established. Due to the complexity of the problem, traditional algorithms are not enough, and more efficient optimization algorithms are still needed. According to the characteristics of the problem, the beetle antennae search (BAS) with one beetle is changed into multiple beetles, and Dijkstra algorithm is embedded, a hybrid beetle swarm optimization algorithm (HBSO) is designed to solve the problem, and the case analysis and algorithm analysis are made for three different examples; the datasets are referenced in literature (Lu et al. in Computer Integrated Manufacturing Systems 5:10-14, 2020). Under the three examples, the influence of the customer on the time and cost is different. The confidence level and weight of cost and time have great influence on the decision results. 4PL provider will not affect the choice of transportation route, but will change the choice of 3PL supplier and transportation mode. HBSO is an effective method to solve this problem. It is proved on efficiency, effectiveness and reliability in experiments by comparing with GA, PSO and BAS.
Keyword:
Fourth party logistics
Routing problem
Chance constrained programming
Beetle swarm algorithm
Dijkstra algorithm

期刊

Soft Computing 封面图
Soft Computing
IF:
2.5
论文数:
1.0W
被引数:
2.1W

机构

Y
Yanshan University
学者数:
1.7W
论文数: 1.1W
被引数: 1.3W
N
northeastern university - china
学者数:
3.2W
论文数: 2.7W
被引数: 37
引用论文

引用论文

Fourth party logistics routing problem model with fuzzy duration time and cost discount
err2013-09-01
err52
PREAI
errCui, Yan; Huang, Min; Yang, Shengxiang; Lee, Loo Hay; Wang, Xingwei
err分享
err收藏
err分享
err收藏
A green intermodal service network design problem with travel time uncertainty
err2016-11-01
err163
errOAAI
errDemir, Emrah; Burgholzer, Wolfgang; Hrusovsky, Martin; Arikan, Emel; Jammernegg, Werner; Van Woensel, Tom
err分享
err收藏
HBO-LSTM: Optimized long short term memory with heap-based optimizer for wind power forecasting
err2022-09-01
err90
PREAI
errEwees, Ahmed A.; Al-qaness, Mohammed A. A.; Abualigah, Laith; Abd Elaziz, Mohamed
err分享
err收藏
学者 查看更多内容