arrow
返回

A batch scheduling model for m heterogeneous batch processor

delete2015-06-17
delete8
PRE
AI
N
Nita P.A Hidayat *
A
Andi Cakravastia
T
T.M.A. Ari Samadhi
A
Abdul Hakim Halim
DOI:10.1080/00207543.2015.1056322delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
This research addresses a batch scheduling problem for single item parts with multi due date on m heterogeneous batch processors. The objective is to minimise total actual flowtime of parts through the shop. The total actual flowtime of parts in a batch is the multiplication of the interval between batch arrival time and the due date by the number of parts in the batch. Using the actual flowtime as the objective means it is oriented to satisfy the due date as a commitment to customers, and simultaneously to minimise the length of time of the parts spending in the shop. An algorithm to solve this problem is proposed.
Keyword:
actual flowtime
batch processor
batch scheduling
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

International Journal of Production Research 封面图
International Journal of Production Research
IF:
7.3
论文数:
1.1W
被引数:
3.7W

机构

I
institute technology of bandung
学者数:
5.0K
论文数: 2.9K
被引数: 1
引用论文

引用论文

err分享
err收藏
err
IF0
err
err0
PREAI
err
err分享
err收藏
err分享
err收藏
学者 查看更多内容