返回
A Benders decomposition-based framework for solving quay crane scheduling problems
DOI:10.1016/j.ejor.2018.08.009.png)
摘要
En 中文
In this paper, we study the Quay Crane Scheduling Problem (QCSP) in container terminals. We describe a new mathematical formulation for the QCSP and by addressing the structure of workload assignments we develop an easier way to handle non-crossing constraints. The proposed mathematical formulation is used in an exact solution framework based on logic-based Benders decomposition. The proposed approach decomposes the problem into a workload-assignment master problem and operation-sequence slave subproblems. Logic-based cuts are proposed to ensure the convergence of the approach. Computational results show the effectiveness of the proposed solution approach. (C) 2018 Published by Elsevier B.V.
Keyword:
OR In Maritime Industry
Container Terminal
Quay Crane Scheduling
Logic-Based Benders Decomposition
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
6
论文数:
2.2W
被引数:
6.4W

