arrow
返回

A common approximation framework for early work, late work, and resource leveling problems

delete2020-10-01
delete11
delete
OA
AI
P
Péter Györgyi
T
Tamás Kis *
DOI:10.1016/j.ejor.2020.03.032delete
delete原文链接
delete分享
delete收藏
查看原文
摘要

摘要

En 中文
We study the approximability of four scheduling problems on identical parallel machines. In the late work minimization problem, the jobs have arbitrary processing times and a common due date, and the objective is to minimize the late work, defined as the sum of the portion of the jobs done after the due date. A related problem is the maximization of the early work, defined as the sum of the portion of the jobs done before the due date. We describe a polynomial time approximation scheme for the early work maximization problem, and we extended it to the late work minimization problem after shifting the objective function by a positive value that depends on the problem data. We also prove an inapproximability result for the latter problem if the objective function is shifted by a constant which does not depend on the input. These results remain valid even if the number of the jobs assigned to the same machine is bounded. This leads to an extension of our approximation scheme to two variants of the resource leveling problem with unit time jobs, for which no approximation algorithm is known. (C) 2020 Elsevier B.V. All rights reserved.
Keyword:
Scheduling
late work minimization
early work maximization
resource leveling
approximation algorithms
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

European Journal of Operational Research 封面图
European Journal of Operational Research
IF:
6
论文数:
2.2W
被引数:
6.4W

机构

H
hun-ren
学者数:
1.2W
论文数: 9.4K
被引数: 14
引用论文

引用论文

err分享
err收藏
err分享
err收藏
学者 查看更多内容