返回
A constraint programming approach for the premarshalling problem
DOI:10.1016/j.ejor.2022.07.042.png)
摘要
En 中文
The enormous amount of containers handled at ports hampers the efficiency of terminal operations. The optimization of crane movements is crucial for speeding up the loading and unloading of vessels. To this end, the premarshalling problem aims to reorder a set of containers placed in adjacent stacks with a minimum number of crane movements, so that a container with an earlier retrieval time is not below one with a later retrieval time. In this study, we present a series of constraint programming models to optimally solve the premarshalling problem. Extensive computational comparisons show that the best proposed constraint programming formulation yields better results than the state-of-the-art integer pro-gramming approach. A salient finding in this paper is that the logic behind the model construction in constraint programming is radically different from that of more traditional mixed integer linear program-ming models.(c) 2022 The Authors. Published by Elsevier B.V. This is an open access article under the CC BY-NC-ND license ( http://creativecommons.org/licenses/by-nc-nd/4.0/ )
Keyword:
Logistics
Container terminal optimization
Premarshalling problem
Constraint programming
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
6
论文数:
2.2W
被引数:
6.4W
机构
引用论文
Integrated scheduling of m-truck, m-drone, and m-depot constrained by time-window, drop-pickup, and m-visit using constraint programming使用约束编程对受时间窗口,接送和m访问约束的m卡车,m无人机和m仓库进行集成调度

