arrow
返回

A Critical Path File Location (CPFL) algorithm for data-aware multiworkflow scheduling on HPC clusters

delete2017-09-01
delete3
delete
OA
AI
C
C. Acevedo *
P
Porfídio Hernández
A
Antonio Espinosa
V
Víctor Méndez Muñoz
DOI:10.1016/j.future.2017.04.025delete
delete原文链接
delete分享
delete收藏
查看原文
摘要

摘要

En 中文
A representative set of workflows found in bioinformatics pipelines must deal with large data sets. Most scientific workflows are defined as Direct Acyclic Graphs (DAGs). Despite DAGs are useful to understand dependence relationships, they do not provide any information about input, output and temporal data files. This information about the location of files of data intensive applications helps to avoid performance issues. This paper presents a multiworkflow store-aware scheduler in a cluster environment called Critical Path File Location (CPFL) policy where the access time to disk is more relevant than network, as an extension of the classical list scheduling policies. Our purpose is to find the best location of data files in a hierarchical storage system. The resulting algorithm is tested in an HPC cluster and in a simulated cluster scenario with bioinformatics synthetic workflows, and largely used benchmarks like Montage and Epigenomics. The resulting simulator is tuned and validated with the first test results from the real infrastructure. The evaluation of our proposal shows promising results up to 70% on benchmarks in real HPC clusters using 128 cores and up to 69% of makespan improvement on simulated 512 cores clusters with a deviation between 0.9% and 3% regarding the real HPC cluster. (C) 2017 The Authors. Published by Elsevier B.V.
Keyword:
Multiworkflows
Cluster
Scheduler
Simulation
Critical path
Data processing
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

F
Future Generation Computer Systems-The International Journal of eScience
IF:
6.1
论文数:
6.9K
被引数:
2.3W

机构

A
Autonomous University of Barcelona
学者数:
3.7W
论文数: 2.6W
被引数: 47
引用论文

引用论文

Investigation of the optical properties of the Cr doped CuxO thin film deposited by thermionic vacuum arc plasma
err2019-02-01
err0
PREAI
errSuat Pat; Reza Mohammadigharehbagh; Caner Musaoğlu; Soner Özen; Şadan Korkmaz
err分享
err收藏
A comparison of eleven static heuristics for mapping a class of independent tasks onto heterogeneous distributed computing systems
err2001-06-01
err1.2K
errOAAI
errBraun, TD; Siegel, HJ; Beck, N; Bölöni, LL; Maheswaran, M; Reuther, AI; Robertson, JP; Theys, MD; Yao, B; Hensgen, D; Freund, RF
err分享
err收藏
Blood Lead Concentrations in 1–3 Year Old Lebanese Children: A Cross-sectional study
err2003-04-15
err0
errOAAI
errIman Nuwayhid; Mona Nabulsi; Samar Muwakkit; Sarah Kouzi; George Salem; Mohamed Mikati; Majd Ariss
err分享
err收藏
A modular system for trapping and mass-marking bumblebees: applications for studying food choice and foraging range
err2006-03-10
err0
errOAAI
errAndrew P. Martin; Norman L. Carreck; Jennifer L. Swain; Dave Goulson; Mairi E. Knight; Roddy J. Hale; Roy A. Sanderson; Juliet L. Osborne
err分享
err收藏
err
IF0
err
err0
PREAI
err
err分享
err收藏
Glycogen synthase kinase 3β inhibitor Chir025 reduces neuronal death resulting from oxygen-glucose deprivation, glutamate excitotoxicity, and cerebral ischemia
err2004-08-01
err0
PREAI
errStephen Kelly; Heng Zhao; Guo Hua Sun; Danye Cheng; Yanli Qiao; Jian Luo; Kathleen Martin; Gary K. Steinberg; Stephen D. Harrison; Midori A. Yenari
err分享
err收藏
学者 查看更多内容