返回
A dynamic model for managing overlapped iterative product development
DOI:10.1016/j.ejor.2006.12.022.png)
摘要
En 中文
Intense competition in many industries impels firms to develop more products in less time. Overlapping of development activities is regarded as one of the most promising strategies to reduce project cycle time. However, the gain from overlapping must be weighed against the additional resource and time for rework. This paper presents a new product development (NPD) process model, termed Dynamic Development Process Model (DDPM), for managing overlapped iterative product development. We validated the model with data from a mobile phone development project. The DDPM was employed to identify appropriate policies for the overlapped iterative projects in the case study company. These identified policies were implemented in the company and led to marked improvement in project performance, thus demonstrating the viability of our model. (c) 2007 Elsevier B.V. All rights reserved.
Keyword:
project management
system dynamics
concurrent engineering
design iteration
overlapping
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
6
论文数:
2.2W
被引数:
6.4W
机构
暂无机构信息

