A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times
DOI:10.1016/j.ejor.2008.07.036.png)
摘要
En 中文
We consider the problem of scheduling multiple projects subject to joint resource constraints. Most approaches proposed in the literature so far are based on the unrealistic assumption that resources can be transferred from one project to the other without any expense in time or cost. In order to contribute to closing this gap to reality, we generalise the multi-project scheduling problem by additionally including sequence- and resource-dependent transfer times, which represent setup activities necessary when a resource is removed from one project and reassigned to another (or from one job to another within the same project). In this paper, we define the modified resource constrained multi-project scheduling problem with transfer times (called RCMPSPTT), which aims at minimising the multi-project duration for the single-project approach or the mean project duration for the multi-project approach. We formulate both perspectives as an integer linear program, propose priority rule based solution procedures and present results of comprehensive computational experiments. Provided that the combination of scheduling scheme and priority rules is chosen appropriately, the procedures obtain good results. In particular, resource oriented priority rules are identified to be successful. (C) 2008 Elsevier B.V. All rights reserved.
Keyword:
Project scheduling
Combinatorial optimisation
Mathematical model
Transfer times
Setup
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
6
论文数:
2.2W
被引数:
6.4W