Background: Unit Commitment (UC) is a complication in the domain of power systems engineering which is integral to the secure, efficient, and economic daily operation of a power system. UC is an optimization problem that aims at scheduling which generating units will be on at what time to meet electricity demand over a given horizon and that horizon it's typically 24-48 hours from now. Objective: This research paper proposes a hybrid approach which is the extension of hGADE algorithm aims at solving mixed-integer optimization problem known as the Unit Commitment scheduling problem. The Whale Optimization Algorithm has been incorporated for the calculation of total operation cost of power system operation. Method: The technique has been tested on a 6 unit system by taking into consideration various system and unit constraints. The hybridization of differential evolution, genetic algorithm, and whale optimization algorithm has produced a significant improvement in overall results. Result: It has been found that the average cost of operation is 142814.9603 INR and it gets reduced to 142809.8944 INR after applying optimization (hGADE). The cost is further reduced to 142790.0 INR after the application of the Whale Optimization Algorithm (WOA). Conclusion: In this paper, we present a hybrid approach which involves the blending of Differential Evolution, Genetic Algorithm, and Whale Optimization aim at solving mixed-integer optimization problem known as Unit Commitment scheduling problem and has given promising results.
Keyword:
Unit commitment
Economic dispatch
Genetic algorithm
Whale optimization
Differential evolution
Evolutionary algorithm
Hybrid algorithm
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
S
IF:
5.7
论文数:
966
被引数:
2.9K
机构
引用论文
Optimization of unit commitment problem with ramp-rate constraint and wrap-around scheduling具有爬坡率约束和环绕调度的机组组合问题的优化
Stochastic security-constrained unit commitment with wind power generation based on dynamic line rating基于动态线路评级的随机安全约束风电机组组合
Differential modulation of synaptic plasticity and local circuit activity in the dentate gyrus and CA1 regions of the rat hippocampus by corticosterone
Stress
IF0