arrow
返回

A modified teaching-learning-based optimisation algorithm for bi-objective re-entrant hybrid flowshop scheduling

delete2015-12-14
delete46
PRE
AI
J
Jingnan Shen
王玲 封面图
王玲 (Ling Wang) *
H
Huan-yu Zheng
DOI:10.1080/00207543.2015.1120900delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
In this paper, a modified teaching-learning-based optimisation (mTLBO) algorithm is proposed to solve the re-entrant hybrid flowshop scheduling problem (RHFSP) with the makespan and the total tardiness criteria. Based on the simple job-based representation, a novel decoding method named equivalent due date-based permutation schedule is proposed to transfer an individual to a feasible schedule. At each generation, a number of superior individuals are selected as the teachers by the Pareto-based ranking phase. To enhance the exploitation ability in the promising area, the insertion-based local search is embedded in the search framework as the training phase for the TLBO. Due to the characteristics of the permutation-based discrete optimisation, the linear order crossover operator and the swap operator are adopted to imitate the interactions among the individuals in both the teaching phase and the learning phase. To store the non-dominated solutions explored during the search process, an external archive is used and updated when necessary. The influence of the parameter setting on the mTLBO in solving the RHFSP is investigated, and numerical tests with some benchmarking instances are carried out. The comparative results show that the proposed mTLBO outperforms the existing algorithms significantly.
Keyword:
re-entrant hybrid flowshop scheduling
bi-objective
teaching-learning-based optimisation
decoding method
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

International Journal of Production Research 封面图
International Journal of Production Research
IF:
7.3
论文数:
1.1W
被引数:
3.7W

机构

T
tsinghua university
学者数:
11.9W
论文数: 10.0W
被引数: 137
引用论文

引用论文

Chemical shift assignment of the ataxin-1 AXH domain in complex with a CIC ligand peptide
err2013-07-14
err0
errOAAI
errCesira de Chiara; Geoff Kelly; Rajesh P. Menon; John McCormick; Annalisa Pastore
err分享
err收藏
The hybrid flow shop scheduling problem
err2010-08-01
err657
errOAAI
errRuiz, Ruben; Antonio Vazquez-Rodriguez, Jose
err分享
err收藏
err分享
err收藏
err分享
err收藏
err
IF0
err
err0
PREAI
err
err分享
err收藏
学者 查看更多内容