arrow
返回

A multi-objective optimisation algorithm for the hot rolling batch scheduling problem

delete2013-02-01
delete51
PRE
AI
S
Shu-jin Jia *
J
Jin Yi
G
Genke Yang
B
Baigang Du
J
Jia-Jie Zhu
DOI:10.1080/00207543.2011.654138delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
The hot rolling batch scheduling problem is a hard problem in the steel industry. In this paper, the problem is formulated as a multi-objective prize collecting vehicle routing problem (PCVRP) model. In order to avoid the selection of weight coefficients encountered in single objective optimisation, a multi-objective optimisation algorithm based on Pareto-dominance is used to solve this model. Firstly, the Pareto M????MI?? Ant System (P-MMAS), which is a brand new multi-objective ant colony optimisation algorithm, is proposed to minimise the penalties caused by jumps between adjacent slabs, and simultaneously maximise the prizes collected. Then a multi-objective decision-making approach based on TOPSIS is used to select a final rolling batch from the Pareto-optimal solutions provided by P-MMAS. The experimental results using practical production data from Shanghai Baoshan Iron & Steel Co., Ltd. have indicated that the proposed model and algorithm are effective and efficient.
Keyword:
ant colony optimisation
Pareto optimisation
hot rolling batch scheduling
multi-objective optimisation
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

International Journal of Production Research 封面图
International Journal of Production Research
IF:
7.3
论文数:
1.1W
被引数:
3.7W

机构

S
shanghai jiao tong university
学者数:
15.7W
论文数: 11.7W
被引数: 159
C
china baowu steel group
学者数:
803
论文数: 865
被引数: 1
引用论文

引用论文

学者 查看更多内容