A multivariate approach for top-down project control using earned value management
DOI:10.1016/j.dss.2015.08.002.png)
摘要
En 中文
Project monitoring and the related decision to proceed to corrective action are crucial components of an integrated project management and control decision support system (DSS). Earned value management/earned schedule (EVM/ES) is a project control methodology that is typically applied for top-down project schedule control. However, traditional models do not correctly account for the multivariate nature of the EVM/ES measurement system. We therefore propose a multivariate model for EVM/ES, which implements a principal component analysis (PCA) on a simulated schedule control reference. During project progress, the real EVM/ES observations can then be projected onto these principal components. This allows for two new multivariate schedule control metrics (T-2 and SPE) to be calculated, which can be dynamically monitored on project control charts. Using a computational experiment, we show that these multivariate schedule control metrics lead to performance improvements and practical advantages in comparison with traditional univariate EVM/ES models. (C) 2015 Elsevier B.V. All rights reserved.
Keyword:
Project management
Schedule control
Earned value management (EVM)
Simulation
Principal component analysis (PCA)
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
6.8
论文数:
3.8K
被引数:
1.5W