A new approximation algorithm for two-machine flow shop scheduling with transporter coordinate

delete2025-11-01
delete0
PRE
AI
王
王银玲 (Yinling Wang)
Y
Y. C. Ge
Y
Y. T. Zhang *
H
Hui Tian
DOI:10.1007/s42514-025-00243-0delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
This paper investigates a two-stage flow shop scheduling model incorporating transportation after the job is complete. The system configuration comprises dual processing machines and a single automated transporter with unit capacity. Each job in the production sequence is defined by distinct physical size, and the transporter can load multiple jobs in a batch at the same time. All jobs follow identical processing order across both machines before they are transported to the destination. The goal of this problem is to determine a schedule and the batch scheme for transport, such that the makespan is minimum, where the makespan represents the minimum completion time required for full job processing and delivery operations. We present a novel approximation algorithm achieving a performance ratio of (1+epsilon+22B & lowast;-1)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$(1 + \varepsilon + \frac{2}{2B<^>* - 1})$$\end{document}, where epsilon\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\varepsilon$$\end{document} is an arbitrary positive number in (0, 1] and B & lowast;\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$B<^>*$$\end{document} is the number of batches in an optimal solution. The ratio is asymptotically optimal when B & lowast;\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$B<^>*$$\end{document} tends toward infinity and the parameter epsilon\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\varepsilon$$\end{document} approaches 0. Empirical validation through numerical simulations confirms that our methodology efficiently produces solutions approaching optimality within practical computation times.
Keyword:
Flow shop
Batch and transporter
Approximation algorithms

期刊

C
CCF Transactions on High Performance Computing
IF:
1.9
论文数:
38
被引数:
253

机构

Z
Zhengzhou University
学者数:
6.8W
论文数: 4.4W
被引数: 8.5W
引用论文

引用论文

err分享
err收藏
err分享
err收藏
Flowshop problem F2 →D|v= 1,c≥ 1|Cmax revisited
err2017-03-01
err0
PREAI
errLan,Yan; Han,Xin; Wang,Yinling; Ge,Min; Guo,He; Chen,Xin
err分享
err收藏
err分享
err收藏
err分享
err收藏
On-line scheduling of parallel jobs on two machines
err2008-03-01
err0
errOAAI
errWun-Tat Chan; Francis Y.L. Chin; Deshi Ye; Guochuan Zhang; Yong Zhang
err分享
err收藏
学者 查看更多内容