arrow
返回

A note on a due-date assignment on a two-machine flow-shop

delete2004-03-01
delete34
PRE
AI
M
Motty Birman
G
Gur Mosheiov *
DOI:10.1016/S0305-0548(02)00225-3delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
We address a due-date assignment and scheduling problem in a two-machine flow-shop setting. Our objective is to find both the job schedule and the common due-date which minimize maximum earliness, tardiness and due-date costs. We introduce an efficient (O(n(2) log n)) solution, based on repetitive use of the well-known Johnson Algorithm.
Keyword:
scheduling
due-date assignment
earliness-tardiness
flow-shop
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

C
Computers and Operations Research
IF:
4.3
论文数:
6.5K
被引数:
1.8W

机构

暂无机构信息
引用论文

引用论文

Overexpression of Gremlin-1 in Patients with Loeys-Dietz Syndrome: Implications on Pathophysiology and Early Disease Detection
err2014-08-12
err0
errOAAI
errJasmin Wellbrock; Sara Sheikhzadeh; Leticia Oliveira-Ferrer; Hauke Stamm; Mathias Hillebrand; Britta Keyser; Marianne Klokow; Gabi Vohwinkel; Veronika Bonk; Benjamin Otto; Thomas Streichert; Stefan Balabanov; Christian Hagel; Meike Rybczynski; Frank Bentzien; Carsten Bokemeyer; Yskert von Kodolitsch; Walter Fiedler
err分享
err收藏
Age-related gene expression signatures from limb skeletal muscles and the diaphragm in mice and rats reveal common and species-specific changes
err2023-07-12
err0
errOAAI
errTea Shavlakadze; Kun Xiong; Shawn Mishra; Corissa McEwen; Abhilash Gadi; Matthew Wakai; Hunter Salmon; Michael J. Stec; Nicole Negron; Min Ni; Yi Wei; Gurinder S. Atwal; Yu Bai; David J. Glass
err分享
err收藏
University–Industry Linkages in Thailand: Sources of Weakness in Economic Upgrading
err2013-07-15
err0
PREAI
errRichard F. Doner; Patarapong Intarakumnerd; Bryan K. Ritchie
err分享
err收藏
没有更多内容