返回
A note to: A multiple-rule based constructive randomized search algorithm for solving assembly line worker assignment and balancing problem
DOI:10.1007/s10845-020-01632-8.png)
摘要
En 中文
Some of the solutions reported in a recent paper (Akyol and Baykasoglu in J Intell Manuf 30(2):557-573, 2019.) are infeasible, jeopardising the conclusion that best results for the 75% of the 320 test instances for the ALWABP-2 were obtained. In this note, we explore the contributions of the paper, show that some of the solutions are indeed infeasible and point out possible inconsistencies in the employed heuristic that may be causing this issue.
Keyword:
Assembly line balancing
Worker assignment
Mixed integer linear programming
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
7.4
论文数:
3.5K
被引数:
1.1W

