A novel heuristic algorithm with activity back-shift response model for resource-constrained project scheduling problem
DOI:10.1007/s00500-018-3410-8.png)
摘要
En 中文
The resource-constrained project scheduling problem is one of the most intractable problems in the field of operation research and management science. It is important for both academic research and engineering applications to develop effective solution algorithms for scheduling problems. In this paper, the activity back-shift response model is introduced for scheduling problems, based on which a resource-constrained scheduling model is built, and a two-phase decomposition algorithm is proposed to address the project resource-constraint and timing optimization. The first stage is resource optimization, where the conflicted activities are resolved by a genetic algorithm. In this case, if parallel activities are scrambling resources during resource optimization, the activity priority, determined by comparing the activity back-shift response time, is applied to dissolve the resource conflict. The second stage is timing optimization. After obtaining the progress plan with optimized resource constraints, activities are adjusted to move forward as much as possible. The validity of the proposed algorithm is verified by a real project case. The computational results reveal that the proposed model and algorithm obtain appropriate results and have the potential to be applied to other similar problems.
Keyword:
Resource-constrained project scheduling problem
Activity back-shift response model
Resource conflict resolution
Makespan
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
2.5
论文数:
1.0W
被引数:
2.1W
机构
引用论文
A multi-agent optimization algorithm for resource constrained project scheduling problem一种求解资源受限项目调度问题的多agent优化算法
A multi-threaded local search algorithm and computer implementation for the multi-mode, resource-constrained multi-project scheduling problem多模式资源受限多项目调度问题的多线程局部搜索算法及计算机实现