A Process-Improvement Method for Implementing Earned Value-Based Project Management in Organizations

delete2024-12-01
delete0
PRE
AI
Q
Quentin Panquet
M
Mario Bourgault
R
Robert Pellerin
C
Christophe Danjou
N
Nathalie Perrier *
DOI:10.1061/JCEMD4.COENG-15041delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
Project monitoring has become crucial to the success of organizations in an increasingly competitive industrial environment. As such, earned value management (EVM) is an essential part of project cost control. Over the years, the scientific literature has mainly focused on developing mathematical models to improve EVM, whereas very few researchers have examined the implementation of EVM in organizations. Although some standards provide general guidelines for implementing the methodology, they rarely consider the maturity of the organization or the strategy required to implement it. This paper aims to develop an EVM implementation plan method for organizations. The method identifies the activities to be carried out, their sequencing, and the corresponding roles, techniques, and deliverables associated with each activity. The analysis of this phase of the existing situation allows for a consideration of the organization's maturity level based on a process mapping analysis and its audit of the organization. Relevant recommendations are then identified before defining EVM implementation strategies according to the organization's needs, constraints, and resources. Interviews with professionals allowed for the verification of the relevance of the recommendations before assigning them to the defined implementation strategies at every stage of implementation. The impact of each strategy on the organization's processes is mapped and analyzed to determine the expected costs and benefits. The implementation method was tested successfully within a firm.
Keyword:
Earned value management (EVM)
Project management
Design research methodology (DRM)

期刊

J
Journal of Construction Engineering and Management
IF:
5.1
论文数:
5.1K
被引数:
1.4W

机构

U
universite de montreal
学者数:
4.6W
论文数: 3.8W
被引数: 46
引用论文

引用论文

Serum IP-10 is useful for identifying renal and overall disease activity in pediatric systemic lupus erythematosus
err2017-12-20
err0
PREAI
errChen-xing Zhang; Li Cai; Kang Shao; Jing Wu; Wei Zhou; Lan-fang Cao; Tong-xin Chen
err分享
err收藏
Intestinal Immunomodulation and Shifts on the Gut Microbiota of BALB/c Mice Promoted by TwoBifidobacteriumandLactobacillusStrains Isolated from Human Samples
err2019-04-18
err0
errOAAI
errAlicja M. Nogacka; Sofia Oddi; Nuria Salazar; Jorge A. Reinheimer; Miguel Gueimonde; Gabriel Vinderola; Clara G. de los Reyes-Gavilán
err分享
err收藏
学者 查看更多内容