This paper proposes two innovative approaches to address the two challenges of project portfolio selection: (i) Determining how project interactions influence the final values of project portfolios, and (ii) selecting the best solution from non-dominated project portfolios. First, based on the dependence relationship between projects and technologies, we construct a project co-utilization network indicating project interactions using the co-citation network method. We also consider project interaction as a regularization item of the value function to indicate the influence of project interactions on the value of project portfolios. Second, we propose a refined selection strategy. All the projects are ranked in the order of their appearance in the ranked association rules. Project portfolios having no highly ranked projects are deleted successively until only one of them remains. Finally, a case of multi-objective project portfolio selection is studied and an optimal project portfolio recommended. A comparison shows the availability and advantages of the proposed approaches. (C) 2019 Elsevier Ltd. All rights reserved.
Keyword:
Project portfolio
Project interaction
Multi-objective
Non-dominated solutions
Refined selection
Value and risk
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
7.5
论文数:
3.0W
被引数:
10.2W
机构
引用论文
Demand Response Technology Readiness Levels for Energy Management in Blocks of Buildings用于建筑物中能源管理的需求响应技术准备水平
BUILDINGS
IF3.1
A multiobjective evolutionary approach for linearly constrained project selection under uncertainty不确定条件下线性约束项目选择的多目标进化方法