摘要

摘要

En 中文
The distributed heterogeneous factory system is a typical scenario in the manufacturing industry. A distributed heterogeneous no-wait flowshop scheduling problem with sequence-dependent setup times (DHNWFSP-SDST) is studied in this paper. The differences in factory configuration and transportation time are considered in DHNWFSP-SDST. A mixed-integer linear programming (MILP) model is constructed and an artificial bee colony algorithm (ABC) with Q-learning (QABC) is proposed to address the DHNWFSP-SDST. Heuristic methods named NEH_H and DHHS are designed to construct potential initial candidates for the population. The neighborhood structures based on the job blocks are introduced in QABC to explore the solution space during the evolution processes. The Q-learning mechanism is employed to select neighborhood structures via empirical knowledge in the operation processes. The speed-up methods to accelerate the evaluation of the obtained neighborhood are designed to reduce the computation time of the QABC. The experimental results show that the QABC is a potential algorithm to address the DHNWFSP-SDST.
Keyword:
Heterogeneous flowshop scheduling
sequence-dependent setup times
artificial bee colony algorithm
Q-learning, neighborhood structure

期刊

IEEE Transactions on Automation Science and Engineering 封面图
IEEE Transactions on Automation Science and Engineering
IF:
6.4
论文数:
5.2K
被引数:
1.6W

机构

T
tsinghua university
学者数:
11.9W
论文数: 10.0W
被引数: 137
L
lanzhou university of technology
学者数:
1.2W
论文数: 7.0K
被引数: 4
引用论文

引用论文

Machine learning at the service of meta-heuristics for solving combinatorial optimization problems: A state-of-the-art
err2022-01-01
err228
errOAAI
errKarimi-Mamaghan, Maryam; Mohammadi, Mehrdad; Meyer, Patrick; Karimi-Mamaghan, Amir Mohammad; Talbi, El-Ghazali
err分享
err收藏
A DE-based approach to no-wait flow-shop scheduling
err2009-10-01
err78
PREAI
errQian, B.; Wang, L.; Hu, R.; Huang, D. X.; Wang, X.
err分享
err收藏
err分享
err收藏
err分享
err收藏
学者 查看更多内容