arrow
返回

A self-adaptive hyper-heuristic based multi-objective optimisation approach for integrated supply chain scheduling problems

delete2022-09-01
delete26
PRE
AI
S
Shahed Mahmud *
A
Alireza Abbasi
R
Ripon K. Chakrabortty
M
Michael J. Ryan
DOI:10.1016/j.knosys.2022.109190delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
Recent global changes have prompted manufacturers to shift their production systems to make-to -order (MTO) supply chain (SC), enabling them to adapt customised customer requirements with their rapidly changing behaviours, reduce inventory costs, and obtain competitive advantages in the market. However, traditional MTO-based scheduling approaches fail to consider all the SC stages required for optimal schedules. This study proposes an integrated SC scheduling problem (ISCSP), where supplier, manufacturer and batching decisions are simultaneously optimised in response to heterogeneous customer requirements with time window constraints. Both economic and environmental sustain -ability for the supply portfolio is considered while the manufacturer is modelled using the flexible job shop scheduling (FJS) problem. Since the proposed ISCSP is an extension of the FJS problem, this can also be considered an NP-hard problem, which cannot be solved by traditional optimisation techniques, particularly for larger instances. Thus, a self-adaptive multi-operator and multi-objective hyper-heuristic (SA(MO)(2)H) is designed, where the low-level heuristic utilises strengths of four solution updating heuristics and is intelligently guided by the reinforcement learning, to address the problem. The proposed SA(MO)(2)H integrates environmental sustainability into the evolutionary process to achieve the best possible supply portfolio, adopting the VIKORSORT approach. Finally, a rigorous experimental study on solving a wide range of instances is conducted to evaluate the performance of SA(MO)(2)H against its non-intelligent versions and five existing algorithms. Overall, the most beneficial facet of the developed ISCSP and SA(MO)(2)H is the visibility and meaningful managerial insights provided by the multi-portfolio solutions fostering the responsive relationship among SC stages. (C) 2022 Elsevier B.V. All rights reserved.
Keyword:
Self-adaptive hyper-heuristic
Supply chain scheduling
Flexible job shop
Multi-objective hyper-heuristic
Reinforcement learning

期刊

K
Knowledge-Based Systems
IF:
7.6
论文数:
1.3W
被引数:
4.5W

机构

暂无机构信息
引用论文

引用论文

err分享
err收藏
Flowshop scheduling with sequence dependent setup times and batch delivery in supply chain
err2021-08-01
err21
errOAAI
errRahman, Humyun Fuad; Janardhanan, Mukund Nilakantan; Chuen, Liam Poon; Ponnambalam, S. G.
err分享
err收藏
err分享
err收藏
学者 查看更多内容