A solution to the stochastic unit commitment problem using chance constrained programming

delete2004-08-01
delete231
PRE
AI
U
U. Aytun Öztürk
M
M. Mazumdar
B
Bryan A. Norman
DOI:10.1109/TPWRS.2004.831651delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
This paper develops a solution method for scheduling units of a power-generating system to produce electricity by taking into consideration the stochasticity of the hourly load and its correlation structure. The unit commitment problem is initially formulated as a chance constrained optimization problem in which we require that the load be met with a specified high probability over the entire time horizon. The solution procedure consists of solving a sequence of deterministic versions of the unit commitment problem that converge to the solution of the chance constrained program. For the deterministic unit commitment problems, Lagrangian relaxation is used to separate the dual problem into its subproblems. Each subproblem is solved by a dynamic program. The initial results indicate that accounting for the correlation structure of the hourly loads reduces the value of the objective function when the optimization problem is formulated as a chance constrained program. Monte Carlo simulation is used to verify the accuracy of the solution provided by the algorithm. The relationship that the unit commitment solution found using the chance constrained optimization approach has with that found using conventional spinning reserves is discussed.
Keyword:
chance constrained programming
electric power generation
spinning reserves
unit commitment
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

IEEE Transactions on Power Systems 封面图
IEEE Transactions on Power Systems
IF:
7.2
论文数:
1.1W
被引数:
5.0W

机构

暂无机构信息