摘要

摘要

En 中文
PurposeThe accuracy and reliability of subjectively assessing a construction project's complexity at the pre-construction stage is questionable and relies upon the project manager's tacit experiences, knowledge and background. The purpose of this paper is to develop a scientifically robust analytical approach by presenting a novel classification mechanism for defining the level of project complexity in terms of work contents (WCs), scope, building structures (BSs) and site conditions.Design/methodology/approachEmpiricism is adopted to deductively analyze variables obtained from secondary data within extant literature and primary project data to develop project type classifications. Specifically, and from an operational perspective, a two-stage waterfall process was adopted. In stage one, the research identified 56 variables affecting project complexity from literature and utilized a structured questionnaire survey of 100 project managers to measure the relevance of these. A total of 27 variables were revealed to be significant and exploratory factor analysis (EFA) is adopted to cluster these variables into six-factor thematic groups. In stage two, data from 62 real-life projects (including the layout and structural plans) were utilized for computing the factor score using the six-factor groups. Finally, hierarchical cluster analysis (HCA) is adopted to classify the projects into collected distinctive groups and each of a similar nature and characteristics.FindingsThe developed theoretical framework (that includes a novel complex index) provides a robust blueprint platform for main contractors to compile their project complexity database. The research outputs enable project managers to generate a more accurate picture of complexity at the pre-construction stage.Originality/valueWhile numerous research articles have provided a comprehensive framework to define project complexity, scant empirical works have assessed it at the pre-construction stage or utilized real-life project samples to classify it. This research addresses this knowledge gap within the prevailing body of knowledge.
Keyword:
Construction project complexity
Clustering analysis
Staffing allocation
Pre-construction stage

期刊

J
Journal of Construction Engineering and Management
IF:
5.1
论文数:
5.1K
被引数:
1.4W

机构

U
University of Canberra
学者数:
2.7K
论文数: 3.0K
被引数: 5.6K
B
Birmingham City University
学者数:
1.6K
论文数: 1.6K
被引数: 1.3K
C
City University of Hong Kong
学者数:
2.3W
论文数: 3.0W
被引数: 6.1W
U
University of Newcastle
学者数:
1.5W
论文数: 1.5W
被引数: 16
学者 查看更多机构
引用论文

引用论文

Isolation and characterization of a wheat F8-1 homolog required for physiological male sterility induced by a chemical hybridizing agent (CHA) SQ-1
err2015-02-24
err0
PREAI
errYulong Song; Junwei Wang; Gaisheng Zhang; Xinliang Zhao; Pengfei Zhang; Na Niu; Shoucai Ma
err分享
err收藏
err分享
err收藏
Swimming training improves cardiovascular autonomic dysfunctions and prevents renal damage in rats fed a high‐sodium diet from weaning
err2020-12-24
err0
errOAAI
errJaqueline Aparecida de Souza; Lenice Kappes Becker; Marcos Adriano Carlos Batista; Daiane Cristina de Assis Braga; Paula Magalhães Gomes; Andréia Carvalho Alzamora; Maria Aparecida Ribeiro Vieira; Wanderson Geraldo de Lima; Marina Gonçalves Caetano Andrade; Bruno de Lima Sanches; Nádia Lúcia Totou; Francisco de Assis Dias Martins Júnior; Lisandra Brandino de Oliveira; Vagner Roberto Antunes; Leonardo Máximo Cardoso
err分享
err收藏
err分享
err收藏
Relationships between Project Complexity and Communication
err2013-04-01
err111
PREAI
errSenescu, Reid Robert; Aranda-Mena, Guillermo; Haymaker, John Riker
err分享
err收藏
学者 查看更多内容