A three-stage decomposition algorithm for decentralized multi-project scheduling under uncertainty

delete2021-10-01
delete18
PRE
AI
D
Dongning Liu
徐
徐哲 (Zhe Xu) *
F
Feifei Li
DOI:10.1016/j.cie.2021.107553delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
Decentralized management of multiple projects is a common practice in areas such as maintenance service, supply chain management, and globalized manufacturing. Nevertheless, the resolution of resource conflicts among multiple projects caused by management independence is a challenging task in generating a multi-project baseline schedule. Various unexpected events may also affect the project execution phase, leading to resource disruptions that can cause the baseline schedule to become infeasible and necessitate its repair. Here, we study the decentralized multi-project scheduling problem subject to global resource disruption, which is NP-hard. To obtain high-quality baseline schedules and effectively repair disrupted schedules, we formulated a three-stage decomposition model. Then, we developed a three-stage decomposition algorithm with a task-scoring mechanism (TDA-TS), which is generic for the processes of schedule generation and repair. Proposed new priority rules were developed that used information about the local schedules and were organized as TDA-TS to further improve its performance. A comprehensive experiment was conducted on the Multi-Project Scheduling Problem LIBrary dataset. The experimental results indicated that the proposed algorithm outperformed several existing centralized and distributed algorithms in the generation of baseline schedules and that it could effectively repair disrupted schedules even for large instances. Furthermore, we saw that the newly proposed priority rule embedded in TDA-TS significantly outperformed other priority rules in repairing the disrupted schedules. The results of this research are valuable for managers who need to effectively repair disrupted schedules in a decentralized multi-project environment facing various disruptions.
Keyword:
Multi-project scheduling
Decentralized scheduling
Resource disruption
Priority rule
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

Computers and Industrial Engineering 封面图
Computers and Industrial Engineering
IF:
6.5
论文数:
1.0W
被引数:
3.8W

机构

B
Beihang University
学者数:
5.2W
论文数: 4.1W
被引数: 37
B
Beijing Union University
学者数:
1.1K
论文数: 893
被引数: 927
引用论文

引用论文

Mechanisms of Acantholysis in Pemphigus Vulgaris: Role of IgG Valence
err1997-10-01
err0
PREAI
errJosé M. Mascaró; Agustı́n España; Zhi Liu; Xiang Ding; Sue J. Swartz; Janet A. Fairley; Luis A. Diaz
err分享
err收藏
err分享
err收藏
err
IF0
err
err0
PREAI
err
err分享
err收藏
CD4+ regulatory T cells in autoimmunity and allergy
err2002-12-01
err0
PREAI
errMaria A Curotto de Lafaille; Juan J Lafaille
err分享
err收藏
学者 查看更多内容