A three-stage decomposition algorithm for decentralized multi-project scheduling under uncertainty
DOI:10.1016/j.cie.2021.107553.png)
摘要
En 中文
Decentralized management of multiple projects is a common practice in areas such as maintenance service, supply chain management, and globalized manufacturing. Nevertheless, the resolution of resource conflicts among multiple projects caused by management independence is a challenging task in generating a multi-project baseline schedule. Various unexpected events may also affect the project execution phase, leading to resource disruptions that can cause the baseline schedule to become infeasible and necessitate its repair. Here, we study the decentralized multi-project scheduling problem subject to global resource disruption, which is NP-hard. To obtain high-quality baseline schedules and effectively repair disrupted schedules, we formulated a three-stage decomposition model. Then, we developed a three-stage decomposition algorithm with a task-scoring mechanism (TDA-TS), which is generic for the processes of schedule generation and repair. Proposed new priority rules were developed that used information about the local schedules and were organized as TDA-TS to further improve its performance. A comprehensive experiment was conducted on the Multi-Project Scheduling Problem LIBrary dataset. The experimental results indicated that the proposed algorithm outperformed several existing centralized and distributed algorithms in the generation of baseline schedules and that it could effectively repair disrupted schedules even for large instances. Furthermore, we saw that the newly proposed priority rule embedded in TDA-TS significantly outperformed other priority rules in repairing the disrupted schedules. The results of this research are valuable for managers who need to effectively repair disrupted schedules in a decentralized multi-project environment facing various disruptions.
Keyword:
Multi-project scheduling
Decentralized scheduling
Resource disruption
Priority rule
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
6.5
论文数:
1.0W
被引数:
3.8W
机构
引用论文
A multi-agent system for decentralized multi-project scheduling with resource transfers具有资源转移的分散式多项目调度的多agent系统
A market-based multi-agent system model for decentralized multi-project scheduling基于市场的分散式多项目调度多agent系统模型
A Multi-PR Heuristic for Distributed Multi-Project Scheduling With Uncertain Duration
IEEE ACCESS
IF3.6