arrow
返回

A tree search algorithm for the crew scheduling problem

delete1996-11-01
delete62
PRE
AI
J
J. E. Beasley *
B
Buyang Cao
DOI:10.1016/0377-2217(95)00093-3delete
delete原文链接
delete分享
delete收藏
摘要

摘要

En 中文
In this paper we consider the crew scheduling program, that is the problem of assigning K crews to N tasks with fixed start and finish times such that each crew does not exceed a limit on the total time it can spend working. A zero-one integer linear programming formulation of the problem is given, which is then relaxed in a lagrangean way to provide a lower bound which is improved by subgradient optimisation. Finally a tree search procedure incorporating this lower bound is presented to solve the problem to optimality. Computational results are given for a number of randomly generated test problems involving between 50 and 500 tasks.
Keyword:
crew scheduling
Lagrangean relaxation
optimisation
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

A combined transportation and scheduling problem
err1997-02-01
err55
PREAI
errEqui, L; Gallo, G; Marziale, S; Weintraub, A
err分享
err收藏

期刊

European Journal of Operational Research 封面图
European Journal of Operational Research
IF:
6
论文数:
2.2W
被引数:
8.1W

机构

暂无机构信息
引用论文

引用论文

Efficacy and Safety of Tirofiban in Clinical Patients With Acute Ischemic Stroke
err2022-02-08
err0
errOAAI
errBin Han; Teng Ma; Zhendong Liu; Yiqun Wu; Weiwei Tan; Shaoyang Sun; Xuemei Li; Changyan Shao; Duyong Tang; Jinping Sun
err分享
err收藏
err分享
err收藏
err分享
err收藏
err分享
err收藏
err分享
err收藏
Effect of calcination temperature on the properties of CZTS absorber layer prepared by RF sputtering for solar cell applications煅烧温度对射频溅射制备的CZTS吸收层性能的影响
err2017-04-19
err0
errOAAI
errSachin Rondiya; Avinash Rokade; Ashok Jadhavar; Shruthi Nair; Madhavi Chaudhari; Rupali Kulkarni; Azam Mayabadi; Adinath Funde; Habib Pathan; Sandesh Jadkar
err分享
err收藏
学者 查看更多内容