arrow
返回

A versatile algorithm for assembly line balancing

delete2008-01-01
delete74
PRE
AI
N
Nils Boysen *
M
Malte Fliedner
DOI:10.1016/j.ejor.2006.11.006delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
This paper discusses a two stage graph-algorithm, which was designed to solve line balancing problems including practice relevant constraints (GALBP), such as parallel work stations and tasks, cost synergies, processing alternatives, zoning restrictions, stochastic processing times or U-shaped assembly lines. Unlike former procedures, the presented approach can be easily modified to incorporate all of the named extensions. It is not only possible to select and solve single classes of constraints, but rather any combination of them with just slight modifications. (C) 2006 Elsevier B.V. All rights reserved.
Keyword:
production
general assembly line balancing (GALBP)
shortest-path algorithm
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

European Journal of Operational Research 封面图
European Journal of Operational Research
IF:
6
论文数:
2.2W
被引数:
6.4W

机构

暂无机构信息
引用论文

引用论文

An Epitaxy Transfer Process for Heterogeneous Integration of Submillimeter-Wave GaAs Schottky Diodes on Silicon Using SU-8
err2017-11-01
err0
errOAAI
errLinli Xie; Souheil Nadri; Naser Alijabbari; Michael E. Cyberey; Matthew F. Bauwens; Arthur W. Lichtenberger; N. Scott Barker; Robert M. Weikle
err分享
err收藏
err分享
err收藏
err分享
err收藏
Insecticidal activity of Origanum majorana L. essential oil as anti‐cholinergic agent
err2020-06-17
err0
PREAI
errSivaprasath Prabu; Dapeng Jing; Viswanathan Chandran; Preethy Mathew
err分享
err收藏
err分享
err收藏
err2002-01-01
err0
errOAAI
errPaul Emery
err分享
err收藏
学者 查看更多内容