Accelerated cable-stayed bridge construction using terrestrial laser scanning
DOI:10.1016/j.autcon.2020.103269.png)
摘要
En 中文
This study developed a new methodology for measuring and predicting the time variance of the relative displacement between two prefabricated segments during bridge construction to expedite the construction process. In particular, the methodology enables the automated estimation of the relative displacement between two bridge segments. The methodology was applied during the construction of the Cheonsa Bridge in South Korea. First, a terrestrial laser scanner was used to extract the 3D positions of two bridge segments (Segments 17 and 20) simultaneously. Then, the 3D positions of the two segments were monitored over the course of two days to estimate the variation in the relative displacement between the two segments due to daily thermal loading. Given that Segment 18 is attached to Segment 17, the relative displacement between Segments 18 and 20 was predicted based on the displacement between segments 17 and 20. Subsequently, the optimal dimensions of the key segment (Segment 19) to be installed between Segments 18 and 20 were determined, and the key segment was fabricated accordingly. By processing the installment of Segment 18 and the fabrication of Segment 19 in parallel, the construction time of the Cheonsa Bridge was reduced by 10 days.
Keyword:
Terrestrial laser scanning
Automated displacement estimation
Key segment closing
Relative displacement measurement
Cable-stayed bridge
Accelerated bridge construction
As-built modeling
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
11.5
论文数:
6.3K
被引数:
4.2W
机构
暂无机构信息
引用论文
RANDOM SAMPLE CONSENSUS - A PARADIGM FOR MODEL-FITTING WITH APPLICATIONS TO IMAGE-ANALYSIS AND AUTOMATED CARTOGRAPHY随机样本共识-模型拟合的范例,可应用于图像分析和自动制图
Temperature variation in steel box girders of cable-stayed bridges during construction斜拉桥钢箱梁施工过程中的温度变化