Actual construction cost prediction using hypergraph deep learning techniques

delete2025-05-01
delete0
PRE
AI
H
Hao Liu
M
Mingkai Li
J
Jack C.P. Cheng *
C
Chimay Anumba *
L
Liqiao Xia
DOI:10.1016/j.aei.2025.103187delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
Accurate construction cost estimation at early stages is critical to enable project stakeholders to make financial decisions (e.g., set up the project budget). However, the heavy reliance on cost engineers' subjective experience and manual effort in practice makes the estimation an error-prone and time-consuming process. To this end, this study proposes a novel hypergraph deep learning-based framework to predict the actual costs of construction projects accurately and efficiently at early stages. It starts with a systematic hypergraph formulation incorporating construction cost factors and their interrelationships. A hypergraph deep learning model is then developed based on the formulated hypergraph for end-to-end construction cost prediction. Afterwards, model interpretation is undertaken to reveal the cost factor importance from the model training results in a quantitative manner. The framework is validated using an actual construction cost dataset of school projects. The results show high accuracy in cost prediction without human intervention and meaningful interpretations of cost factor importance for better understanding of construction cost patterns.
Keyword:
Hypergraph
Deep learning
Model interpretation
Cost factor importance
Construction cost estimation

期刊

Advanced Engineering Informatics 封面图
Advanced Engineering Informatics
IF:
9.9
论文数:
4.4K
被引数:
1.7W

机构

U
University of Florida
学者数:
4.0W
论文数: 3.1W
被引数: 6.6W
State University System of Florida 封面图
State University System of Florida
学者数:
12.8W
论文数: 10.9W
被引数: 130
引用论文

引用论文

Multiedge Graph Convolutional Network for House Price Prediction
err2023-11-01
err4
PREAI
errMostofi, Fatemeh; Togan, Vedat; Basaga, Hasan Basri; Citipitioglu, Ahmet; Tokdemir, Onur Behzat
err分享
err收藏
err分享
err收藏
Construction Project Cost Escalation Factors
err2009-10-01
err174
PREAI
errShane, Jennifer S.; Molenaar, Keith R.; Anderson, Stuart; Schexnayder, Cliff
err分享
err收藏
学者 查看更多内容