返回
Algorithms for the multiperiod workforce scheduling and routing problem with dependent tasks
DOI:10.1111/itor.12971.png)
摘要
En 中文
Logistics problems lie at the core of industries' everyday operations. These types of problems are also one of the main points of interest in the operational research field of study. In recent years, the workforce scheduling and routing problems (WSRP) class of optimization problems has gained significant attention from researchers. In this paper, a recently proposed WSRP is studied: the multiperiod WSRP with dependent tasks. In this problem, a given company provides services by means of heterogeneously skilled mobile teams. Service requests are known beforehand and each service is composed of one or more activities. Execution of one activity may depend on the completion of another. A feasible schedule in which the requested activities are completed in the minimum amount of days must be provided. Two matheuristic algorithms are proposed. Several new upper bounds for a set of instances from the literature are discovered.
Keyword:
matheuristics
workforce scheduling and routing
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
2.9
论文数:
1.8K
被引数:
3.7K


