An effective approximation algorithm for the Malleable Parallel Task Scheduling problem

delete2012-05-01
delete19
PRE
AI
L
Liya Fan *
张发 封面图
张发 (Fa Zhang)
G
Gongming Wang
刘
刘志勇 (Zhiyong Liu)
DOI:10.1016/j.jpdc.2012.01.011delete
delete原文链接
delete分享
delete收藏
摘要

摘要

En 中文
The Malleable Parallel Task Scheduling problem (MPTS) is an extension of one of the most classic scheduling problems (P parallel to C-max). The only difference is that for MPTS, each task can be processed simultaneously by more than one processor. Such flexibility could dramatically reduce the makespan, but greatly increase the difficulty for solving the problem. By carefully analyzing some existing algorithms for MPTS, we find each of them suitable for some specific cases, but none is effective enough for all cases. Based on such observations, we introduce some optimization algorithms and improving techniques for MPTS, with their performance analyzed in theory. Combining these optimization algorithms and improving techniques gives rise to our novel scheduling algorithm OCM (Optimizations Combined for MPTS), a 2-approximation algorithm for MPTS. Extensive simulations on random datasets and SPLASH-2 benchmark reveal that for all cases, schedules produced by OCM have smaller makespans, compared with other existing algorithms. (C) 2012 Elsevier Inc. All rights reserved.
Keyword:
Scheduling algorithm
Approximation algorithm
Parallel computing
Preemptable malleable task scheduling problem
err2006-04-01
err45
PREAI
errBlazewicz, J; Kovalyov, MY; Machowiak, M; Trystram, D; Weglarz, J
err分享
err收藏
Provable algorithms for parallel generalized sweep scheduling并行广义扫描调度的可证明算法
err2006-06-01
err11
PREAI
errKumar, V. S. Anil; Marathe, Madhav V.; Parthasarathy, Srinivasan; Srinivasan, Aravind; Zust, Sibylle
err分享
err收藏

期刊

Journal of Parallel and Distributed Computing 封面图
Journal of Parallel and Distributed Computing
IF:
4
论文数:
3.8K
被引数:
5.7K

机构

中
中国科学院
学者数:
3.2W
论文数: 8.9K
被引数: 39.2W
引用论文

引用论文

Stabilization of Ferromagnetic States by Electron Doping in Fe-, Co- or Ni-Doped ZnO
err2001-04-01
err0
PREAI
errKazunori Sato Kazunori Sato; Hiroshi Katayama-Yoshida Hiroshi Katayama-Yoshida
err分享
err收藏
Some Optical Properties of Strontium Titanate Crystal
err1955-09-01
err0
PREAI
errS. B. Levin; N. J. Field; F. M. Plock; L. Merker
err分享
err收藏
Preemptable malleable task scheduling problem
err2006-04-01
err45
PREAI
errBlazewicz, J; Kovalyov, MY; Machowiak, M; Trystram, D; Weglarz, J
err分享
err收藏
学者 查看更多内容