In traditional unit commitment models, the ramping process of coal-fired generators is often represented by either a static average ramping rate or a once-changing rate model. However, this approach fails to accurately capture the actual ramping process of the unit, resulting in scheduling biases, particularly in systems with renewable energy sources. To address this issue, we propose a dynamic piecewise linear ramping (DPWLR) model that allows arbitrary multi-changes of ramping rates within a single period. We shift our focus from slope changes to time changes. By using a series of location indicator variables that satisfy the type 2 special ordered set, we locate the forward and backward time change limits and then determine the up and down power output limits of the units at each hour. We tested the intraperiod multiple-changing DPWLR model, as part of the unit commitment model, on different systems, including a 3-unit system, a 10-unit system, the IEEE RTS-79, and a 100-unit system. Comparative analysis demonstrates the functionality and superior performance of our proposed model.
Keyword:
Dynamic ramping model
Intraperiod multiple changing
Time locating
Type 2 special ordered set
Unit commitment
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
9.4
论文数:
4.3W
被引数:
20.2W
机构
引用论文
The impact of energy storage modeling in coordination with wind farm and thermal units on security and reliability in a stochastic unit commitment
ENERGY
IF9.4
Deep learning-based rolling horizon unit commitment under hybrid uncertainties混合不确定条件下基于深度学习的滚动机组组合
ENERGY
IF9.4
A multi-stage stochastic programming model for the unit commitment of conventional and virtual power plants bidding in the day-ahead and ancillary services markets一种多阶段随机规划模型,用于在日前和辅助服务市场中进行常规和虚拟发电厂的单位承诺
APPLIED ENERGY
IF11