An iterated greedy algorithm for solving the total tardiness parallel blocking flow shop scheduling problem

delete2019-05-01
delete76
delete
OA
AI
I
Imma Ribas *
DOI:10.1016/j.eswa.2018.12.039delete
delete原文链接
delete分享
delete收藏
查看原文
摘要

摘要

En 中文
This paper proposes an iterated greedy algorithm for scheduling jobs in F parallel flow shops (lines), each consisting of a series of m machines without storage capacity between machines. This constraint can provoke the blockage of machines if a job has finished its operation and the next machine is not available. The criterion considered is the minimization of the sum of tardiness of all the jobs to schedule, i.e., minimization of the total tardiness of jobs. Notice that the proposed method is also valid for solving the Distributed Permutation Blocking Flow Shop Scheduling Problem (DBFSP), which allows modelling the scheduling process in companies with more than one factory when each factory has an identical flow shop configuration. Firstly, several constructive procedures have been implemented and tested to provide an efficient solution in terms of quality and CPU time. This initial solution is later improved upon with an iterated greedy algorithm that includes a variable neighbourhood search for interchanging or reassigning jobs from the critical line to other lines. Next, two strategies have been tested for selecting the critical line; the one with a higher total tardiness of jobs and the one with a job that has the highest tardiness. The experimental design chooses the best combination of initial solution and critical line selection. Finally, we compare the performance of the proposed algorithm against other benchmark algorithms proposed for the DPFSP, which have been adapted to the problem being considered here since, to the best of our knowledge, this is the first attempt to solve either the Parallel Blocking Flow Shop problem or the Distributed Blocking Flow Shop problem with the goal of minimizing total tardiness. This comparison has allowed us to confirm the good performance of the proposed method. (C) 2019 Elsevier Ltd. All rights reserved.
Keyword:
Parallel flow shop
Distribution flow shop
Blocking
Scheduling
Total tardiness
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

Expert Systems with Applications 封面图
Expert Systems with Applications
IF:
7.5
论文数:
3.0W
被引数:
10.2W

机构

U
universitat politecnica de catalunya
学者数:
1.9W
论文数: 1.6W
被引数: 17
引用论文

引用论文

Is surgical treatment of lipoblastoma always necessary?
err2000-10-01
err0
PREAI
errG. Mognato; G. Cecchetto; M. Carli; E. Talenti; E.S.G. d'Amore; F. Pederzini; M. Guglielmi
err分享
err收藏
The susceptibility of strains of mice to infection with Trypanosoma congolense
err1978-11-01
err0
PREAI
errF.W. Jennings; D.D. Whitelaw; P.H. Holmes; G.M. Urquhart
err分享
err收藏
err分享
err收藏
How do associations between sleep duration and metabolic health differ with age in the UK general population?
err2020-11-23
err0
errOAAI
errAnmol Arora; David Pell; Esther M. F. van Sluijs; Eleanor M. Winpenny
err分享
err收藏
err分享
err收藏
学者 查看更多内容