arrow
返回

An iterative algorithm for battery-aware task scheduling on portable computing platforms

delete2024-09-06
delete12
delete
OA
AI
J
J. Khan
R
Ranga Vemuri
DOI:10.1109/DATE.2005.62delete
delete原文链接
delete分享
delete收藏
查看原文
摘要

摘要

En 中文
In this work we consider battery powered portable systems which either have Field Programmable Gate Arrays (FPGA) or voltage and frequency scalable processors as their main processing element. An application is modeled in the form of a precedence task graph at a coarse level of granularity. We assume that for each task in the task graph several unique design-points are available which correspond to different hardware implementations for FPGAs and different voltagefrequency combinations for processors. It is assumed that performance and total power consumption estimates for each design-point are available for any given portable platfrorn, including the peripheral components such as memory and display power usage. We present an iterative heuristic algorithm which finds a sequence of tasks along with art appropriate design-point for each task, such that a deadline is met and the amount of battery energy used is as small as possible. A detailed illustrative example along with a case study of a real-world application of a robotic arm controller which demonstrates the usefulness of our algorithm is also presented.
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

D
Design, Automation and Test in Europe Conference and Exhibition
IF:
0
论文数:
20
被引数:
0

机构

暂无机构信息
引用论文

引用论文

Plastic waste inputs from land into the ocean
err2015-02-13
err0
PREAI
errJenna R. Jambeck; Roland Geyer; Chris Wilcox; Theodore R. Siegler; Miriam Perryman; Anthony Andrady; Ramani Narayan; Kara Lavender Law
err分享
err收藏