返回
An optimization model for refinery production scheduling
DOI:10.1016/S0925-5273(00)00162-6.png)
摘要
En 中文
In this paper we describe a production planning and scheduling problem in an oil refinery company. The problem concerns the planning and the utilization of a production process consisting of one distillation unit and two hydro-treatment units. In the process crude oil is transformed to bitumen and naphthenic special oils. The aim of the scheduling is to decide which mode of operation to use in each processing unit at each point in time, in order to satisfy the demand while minimizing the production cost and taking storage capacities into account. The production cost includes costs for changing mode and for holding inventory. We formulate a mixed integer linear programming model for the scheduling problem. The model can be regarded as a generalized lot-sizing problem, where inventory capacities are considered and more than one product is obtained for some modes of operation. A number of modifications and extensions of the model are also discussed. It is shown how the optimization model can be used as a viable tool for supporting production planning and scheduling at the refinery, and that it is possible to analyze scheduling scenarios of realistic sizes. It is also shown that the model can support shipment planning and strategic decisions concerning new products and investments in storage capacity. (C) 2002 Elsevier Science B.V. All rights reserved.
Keyword:
refinery planning
lot-sizing
process scheduling
optimization model
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
10
论文数:
8.0K
被引数:
3.6W
机构
暂无机构信息
引用论文
Adsorption of Cu(II), Pb(II), and Cd(II) Ions from Acidic Aqueous Solutions by Diethylenetriaminepentaacetic Acid-Modified Magnetic Graphene Oxide二乙烯三胺五乙酸改性的磁性氧化石墨烯对酸性水溶液中Cu(II),Pb(II) 和Cd(II) 离子的吸附
没有更多内容

