An Uncertain Random Programming Model for Project Scheduling Problem

delete2014-10-18
delete51
delete
OA
AI
柯华 封面图
柯华 (Hua Ke)
刘惠敏 封面图
刘惠敏 (Huimin Liu) *
田广东 封面图
田广东 (Guangdong Tian)
DOI:10.1002/int.21682delete
delete原文链接
delete分享
delete收藏
查看原文
摘要

摘要

En 中文
Project scheduling problem (PSP) is to determine the resource allocation schedule for the trade-off between the project cost and the completion time. In this paper, PSP in the environment with uncertainty and randomness simultaneously is considered. In detail, the concepts of uncertain variable and uncertain random variable are introduced. Based on some concepts and theorems of chance theory, an uncertain random project scheduling model is built. For some special case, the proposed uncertain random programming model is transformed to a crisp mathematical programming model. Besides, uncertain random simulation techniques and genetic algorithm are integrated into a hybrid intelligent algorithm for searching the quasi-optimal schedule. (C) 2014 Wiley Periodicals, Inc.
Keyword:
FUZZY RANDOM-VARIABLES
NETWORK
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

International Journal of Intelligent Systems 封面图
International Journal of Intelligent Systems
IF:
3.7
论文数:
3.1K
被引数:
8.1K

机构

N
northeast forestry university - china
学者数:
1.2W
论文数: 7.9K
被引数: 9
T
tongji university
学者数:
7.9W
论文数: 6.0W
被引数: 98
引用论文

引用论文

err
IF0
err
err0
PREAI
err
err分享
err收藏
学者 查看更多内容