摘要

摘要

En 中文
Flow shop scheduling problem consists of scheduling given jobs with same order at all machines. The job can be processed on at most one machine; meanwhile one machine can process at most one job. The most common objective for this problem is makespan. However, multi-objective approach for scheduling to reduce the total scheduling cost is important. Hence, in this study, we consider the flow shop scheduling problem with multi-objectives of makespan, total flow time and total machine idle time. Ant colony optimization (ACO) algorithm is proposed to solve this problem which is known as NP-hard type. The proposed algorithm is compared with solution performance obtained by the existing multi-objective heuristics. As a result, computational results show that proposed algorithm is more effective and better than other methods compared. (C) 2007 Elsevier Ltd. All rights reserved.
Keyword:
flow shop
scheduling
multi-objective
ant colony optimization
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

Computers and Industrial Engineering 封面图
Computers and Industrial Engineering
IF:
6.5
论文数:
1.0W
被引数:
3.8W

机构

U
Uludag University
学者数:
3.5K
论文数: 2.5K
被引数: 7
I
Istanbul Technical University
学者数:
8.9K
论文数: 7.8K
被引数: 7.9K
引用论文

引用论文

Reliability of ultra thin oxide and nitride films in the 1 nm to 2 nm range
err1999-09-01
err0
PREAI
errB. Yuwono; T. Schloesser; A. Gschwandtner; G. Innertsberger; A. Grassl; A. Olbrich; W.H. Krautschneider
err分享
err收藏
学者 查看更多内容