arrow
返回

Ant Colony Optimization for Multimode Resource-Constrained Project Scheduling

delete2012-04-01
delete41
PRE
AI
H
Hong Zhang *
DOI:10.1061/(ASCE)ME.1943-5479.0000089delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
An ant colony optimization (ACO)-based methodology for solving a multimode resource-constrained project scheduling problem (MRCPSP) with the objective of minimizing project duration is presented. With regards to the need to determine sequence and mode selection of activities for the MRCPSP, two levels of pheromones for each ant are proposed to guide the search course in the ACO algorithm. The corresponding heuristics and probabilities for each type of the pheromone are considered, and their calculation algorithms are presented. The flowchart of the proposed ACO algorithm is described, where a serial schedule generation scheme is adopted to transform an ACO solution into a feasible schedule. The effectiveness and efficiency of the proposed ACO methodology are justified through a series of computational analyses. The study is expected to provide a more effective alternative methodology for solving the MRCPSP by utilizing the ACO theory. DOI: 10.1061/(ASCE)ME.1943-5479.0000089. (C) 2012 American Society of Civil Engineers.
Keyword:
Ant colony optimization
Resource-constrained
Multiple execution modes
Project scheduling
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

J
Journal of Management in Engineering
IF:
7
论文数:
3.1K
被引数:
6.8K

机构

暂无机构信息
引用论文

引用论文

Pharmacological and Nonpharmacological Treatment After Cardiac Surgery
err2014-09-01
err0
PREAI
errAlessandro Durante; Luca Rosario Limite; Giovanni Peretto; Alessandra Laricchia; Francesco Ancona; Antonio Mangieri; Domenico Cianflone
err分享
err收藏