arrow
返回

APPLYING A MODIFIED COEFFICIENT REDUCTION METHOD TO A DYNAMIC PRODUCTION SCHEDULING MODEL

delete1992-01-01
delete4
delete
OA
AI
M
Monique Guignard *
M
Matthew J. Liberatore
DOI:10.1016/0377-2217(92)90297-Mdelete
delete原文链接
delete分享
delete收藏
查看原文
摘要

摘要

En 中文
This paper develops and tests a short-run production scheduling model for process industry application. We consider a multi-product, multi-period environment, where a subset of the products can be produced on each of the production lines at a fixed rate per period. The resulting 0-1 mixed integer programming problem is difficult to solve using commercial optimization software. A preprocessing method based on coefficient reduction was modified to exploit the problem structure. This preprocessing tightens the problem prior to solution by a commercial branch-and-bound code. The remaining duality gap is defined as the percentage difference between the best feasible value and the tightest bound found, i.e. it is the maximum improvement in objective function value that can still be expected. Gaps of less than 4% were found in all test problems when production losses were zero. With the inclusion of production losses, preprocessing led to about a 50% reduction in the remaining gaps. Additional computational studies found that this approach can process constraints having up to 80-110 variables. Further research is suggested to investigate the computational effectiveness of other solution approaches.
Keyword:
INTEGER PROGRAMMING
PRODUCTION SCHEDULING
COEFFICIENT REDUCTION
PREPROCESSING
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

European Journal of Operational Research 封面图
European Journal of Operational Research
IF:
6
论文数:
2.2W
被引数:
6.4W

机构

暂无机构信息
引用论文

引用论文

err
IF0
err
err0
PREAI
err
err分享
err收藏
err分享
err收藏
Lars Romell
err2018-09-24
err0
PREAI
errC. L. Shear
err分享
err收藏
Notes and Brief Articles
err2018-09-24
err0
PREAI
errJ. A. Stevenson; W. L. White; W. Buddin
err分享
err收藏