arrow
返回

Assembling Components with Probabilistic Lead Times

delete2019-05-01
delete0
delete
OA
AI
DOI:10.1088/1757-899x/521/1/012013delete
delete原文链接
delete分享
delete收藏
查看原文
摘要

摘要

En 中文
Abstract This paper examines a production model in which N different types of components are used to assemble a finished product. The components are acquired from various suppliers in lots received at or before the beginning of the assembly process. The lead time between placing and receiving each of the N orders is assumed to be a random variable having a known probability density function. Based on recent results regarding the probability distribution and the expectation of the maximum of a set of independent random variables, the mathematical model describing this production/inventory situation is developed. The mathematical model is then used to derive a closed form formula for the optimal solution that minimizes the total production/inventory cost function. Moreover, the reorder point is shown to depend on the probability distribution and expected value of the random variable representing the maximum among the N lead times. The case in which each of the N lead times follows a Weibull distribution is investigated, and a numerical example is given to illustrate this case.
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

暂无期刊信息

机构

暂无机构信息
引用论文

引用论文

暂无论文信息