arrow
返回

Bi-objective scheduling on a restricted batching machine

delete2018-12-01
delete9
PRE
AI
M
Marta Cabo
J
José Luis González–Velarde
E
Edgar Possani *
Y
Yasmin Rios Solis
DOI:10.1016/j.cor.2018.07.004delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
In this work, we consider a batching machine that can process several jobs at the same time. Batches have a restricted batch size, and the processing time of a batch is equal to the largest processing time among all jobs within the batch. We solve the bi-objective problem of minimizing the maximum lateness and number of batches. This function is relevant as we are interested in meeting due dates and minimizing the cost of handling each batch. Our aim is to find the Pareto-optimal solutions by using an epsilon-constraint method on a new mathematical model that is enhanced with a family of valid inequalities and constraints that avoid symmetric solutions. Additionally, we present a biased random-key genetic algorithm to approximate the optimal Pareto points of larger instances in reasonable time. Experimental results show the efficiency of our methodologies. (C) 2018 Elsevier Ltd. All rights reserved.
Keyword:
Scheduling
Batching machine
Integer linear programming
BRKGA
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

C
Computers and Operations Research
IF:
4.3
论文数:
6.5K
被引数:
1.8W

机构

U
universidad autonoma de nuevo leon
学者数:
7.0K
论文数: 3.9K
被引数: 1
T
Tecnologico de Monterrey
学者数:
7.6K
论文数: 5.7K
被引数: 5
I
instituto tecnologico autonomo de mexico
学者数:
279
论文数: 340
被引数: 0
学者 查看更多机构