返回
BIM-based construction scheduling optimization through graph neural network–driven spatial semantic reasoning
DOI:10.1016/j.jii.2026.101088.png)
摘要
En 中文
• BIM-based semantic graph explicitly models spatial relations. • GraphSAGE learns implicit BIM dependencies adaptively. • Dynamic Layering Scheduling Algorithm (DLSA) optimizes tasks. • Proposed method boosts resource use and reduces conflicts.
Keyword:
BIM
graph neural network
construction scheduling
spatial semantic reasoning
dynamic layering
期刊
IF:
11.6
论文数:
901
被引数:
4.4K
机构
引用论文
BIM-based semantic enrichment and knowledge graph generation via geometric relation checking基于BIM的语义增强与通过几何关系检查的知识图谱生成
Indoor visual positioning using stationary semantic distribution registration and building information modeling基于静止语义分布注册和建筑信息模型的室内视觉定位

