返回
BOT projects: Incentives and efficiency
DOI:10.1016/j.jdeveco.2009.11.008.png)
摘要
En 中文
In recent years, governments have been increasingly adopting Build-Operate-Transfer (BOT) contracts for large infrastructure projects. However, BOT contracts have received little attention from economists. The apparent agency problem in BOT projects has never been analyzed. In this paper, we develop a model to examine the incentives, efficiency and regulation in ROT contracts. We show that a BOT contract with a price regulation during the concession period and a license extension after the concession period is capable of achieving full efficiency. Both license extension and price control are observed in many real-world BOT projects. We also investigate the efficiency in such contracts by considering other factors, including time consistency, price ceiling, foreign ownership, and the lack of price regulation. (C) 2009 Elsevier ay. All rights reserved.
Keyword:
BOT
Infrastructure
Incentives
Monopoly
Regulation
License policy
期刊
IF:
4.6
论文数:
4.0K
被引数:
1.6W
机构
引用论文
What the change of system from socialism to capitalism does and does not mean制度从社会主义向资本主义的转变意味着什么,不意味着什么
Incomplete contracts and public ownership: Remarks, and an application to public-private partnerships
ECONOMIC JOURNAL
IF3.6
没有更多内容

