Abstract

Abstract

En 中文
• Constructs a national unified power system model considering inter-provincial transmission grids. • Simulates the dynamic expansion planning of the power system from 2020 to 2050. • 1993GW transmission grids is need for inter-provincial power exchange in 2050. • The total inter-provincial electricity exchange is 57% of the total annual power demand in 2050. • The total cost from 2020 to 2050 is 155 trillion yuan.

Journal

Computers and Industrial Engineering cover
Computers and Industrial Engineering
IF:
6.5
Papers:
1.0W
Citations:
3.8W

Organization

No organization information available
Cited Papers

Cited Papers

Citing Papers

Citing Papers