Bridge construction schedule generation with pattern-based construction methods and constraint-based simulation
DOI:10.1016/j.aei.2010.07.002.png)
摘要
En 中文
This paper presents a novel methodology which assists in automating the generation of time schedules for bridge construction projects. The method is based on a simulation of construction works, taking into account the available resources and the interdependencies between individual tasks The simulation is realized by means of a discrete-event simulation software originally created for plant layout in the manufacturing industry Due to the fact that the fixed process chains provided are too rigid to model the spontaneous construction task sequences, a constraint module that dynamically selects the following task has been incorporated Constraint module input data is formed by activity packages comprising of the affected building element, the required material, machine and manpower resources, as well as the technological pre-requisites of the activity to be performed Since manual creation of the large set of activity packages is laborious and error-prone, a 3D model-based application has been developed which allows the interactive assignment of construction methods to individual building elements. To facilitate this process, a level-of-detail approach has been implemented which allows the user to successively refine both the process model and the corresponding product model The discrete-event simulation system uses all the given information to create a proposal for the construction schedule automatically, which may then be refined using standard scheduling software (C) 2010 Elsevier Ltd All rights reserved.
Keyword:
Construction method
Constraint-based simulation
Monte-Carlo method
Process pattern
Schedule generation
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
9.9
论文数:
4.4K
被引数:
1.7W