返回
Communication cost estimation for parallel CFD using variable time-stepping algorithms
DOI:10.1016/S0045-7825(00)00167-5.png)
摘要
En 中文
Variable time-stepping algorithm can greatly reduce the execution time of parallel CFD by allowing each parallel CFD process to select its own computation and communication time-steps according to the computational stability conditions. However. this algorithm significantly complicates the task of deriving the cost function for computer load balancing. Computer load balancing for parallel CFD requires a cost function that generally uses the elapsed CFD execution time as the cost. The cost function consists of three components: the computation cost the communication cost, and the idle cost. Since the execution of parallel CFD using variable time-stepping approach causes the change the load of of computer and network even in a single user environment, the cost function should be derived based on the measurement of the parallel CFD execution time. The derived cost function can be used for predicting the elapsed time of future program execution. In this paper, the derivation of communication cost function for a parallel CFD using variable time-stepping algorithm is described. The accuracy of the communication cost function is demonstrated by two test cases and has been successfully used in dynamic computer load balancing. (C) 2000 Elsevier Science S.A, All rights reserved.
Keyword:
FLUID-DYNAMICS PROBLEMS
COMPUTATION
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
7.3
论文数:
1.3W
被引数:
5.6W
机构
暂无机构信息
引用论文
Positive and negative hysteresis effects for the perception of geometric and emotional ambiguities
PLOS ONE
IF0
没有更多内容

