Comparing procurement methods for design-build projects

delete2006-03-01
delete139
delete
OA
AI
E
El Wardani, MA
M
Messner, JI
H
Horman, MJ
DOI:10.1061/(ASCE)0733-9364(2006)132:3(230)delete
delete原文链接
delete分享
delete收藏
查看原文
摘要

摘要

En 中文
The design-build delivery method is increasingly used in the United States due to numerous advantages it can offer a project. An important issue associated with design-build delivery is the procurement method used to select the design-build team. It is a critical decision that involves several key project team members, including the owner, designer, and contractor organizations, and requires the owner to carefully choose the design-build procurement method that will be used to select the team that will deliver the project. This research quantitatively analyzed the correlation between the design-build procurement method and the performance of the design-build project with regard to cost, time, and quality metrics. The procurement methods studied were sole source, qualifications-based, best value, and low bid selection. Data were collected through surveys from 76 design-build projects in the United States. Based on the patterns and relationships identified from these data, a better understanding of the procurement process and how it influences project performance is achieved. The impact of project-specific factors and guidelines are presented to assist owners in selecting the design-build team procurement method that responds to their project goals.
Keyword:
delivery
design/build
construction industry
procurement
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

J
Journal of Construction Engineering and Management
IF:
5.1
论文数:
5.1K
被引数:
1.4W

机构

暂无机构信息
引用论文

引用论文

err分享
err收藏
err分享
err收藏
err
IF0
err
err0
PREAI
err
err分享
err收藏
没有更多内容