arrow
返回

Complexity and approximation for scheduling problem for a torpedo

delete2011-09-01
delete5
delete
OA
AI
G
Gilles Simonin *
R
Rodolphe Giroudeau
K
Koenig, J. C.
DOI:10.1016/j.cie.2011.01.015delete
delete原文链接
delete分享
delete收藏
查看原文
摘要

摘要

En 中文
This paper considers a special case of the coupled-tasks scheduling problem on monoprocessor. The general problems were analyzed in depth by Orman and Potts (1997). In this paper, we consider that all processing times are equal to 1, the gap has exact length L, we have precedence constraints, incompatibility constraints are introduced and the criterion is to minimize the scheduling length. We use this problem to study the problem of data acquisition and data treatment of a torpedo under the water. We show that this problem is NP-complete and we propose an rho-approximation algorithm where rho <= (L+6)/6 - 1/2(L+2) + (L+3)/6n(L+2). (C) 2011 Elsevier Ltd. All rights reserved.
Keyword:
Scheduling
Coupled-tasks
Incompatibility constraints
Complexity
Approximation
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

Computers and Industrial Engineering 封面图
Computers and Industrial Engineering
IF:
6.5
论文数:
1.0W
被引数:
3.8W

机构

C
centre national de la recherche scientifique (cnrs)
学者数:
24.5W
论文数: 18.2W
被引数: 279
引用论文

引用论文

Scheduling for a multifunction phased array radar system
err1996-04-01
err100
PREAI
errOrman, AJ; Potts, CN; Shahani, AK; Moore, AR
err分享
err收藏
Treatment approaches for acute mania
err1993-01-01
err0
PREAI
errJames C. -Y. Chou; Ivan Tuma; Eileen A. Sweeney
err分享
err收藏
Comparative Effectiveness of Proton Therapy versus Photon Radiotherapy in Adolescents and Young Adults for Classical Hodgkin Lymphoma
err2022-01-01
err0
errOAAI
errJames E. Bates; Stephanie Terezakis; Christopher G. Morris; Avani D. Rao; Shuchi Sehgal; Rahul Kumar; Raymond B. Mailhot Vega; Nancy P. Mendenhall; Bradford S. Hoppe
err分享
err收藏
CHILDHOOD POISONING IN HONG KONG: EXPERIENCE OF THE DRUG AND POISONS INFORMATION BUREAU FROM 1988 TO 1992
err2008-03-10
err0
errOAAI
errT. Y. K. CHAN; J. A. J. H. CRITCHLEY; J. C. N. CHAN; B. TOMLINSON; M. S. W. LAU; P. J. ANDERSON; G. S. N. LAU; K. W. H. SO
err分享
err收藏
Scheduling of coupled tasks and one-machine no-wait robotic cells
err2009-02-01
err32
PREAI
errBrauner, Nadia; Finke, Gerd; Lehoux-Lebacque, Vassilissa; Potts, Chris; Whitehead, Jonathan
err分享
err收藏
err
IF0
err
err0
PREAI
err
err分享
err收藏
Modelling for the control of a complex radar system
err1998-03-01
err19
PREAI
errOrman, AJ; Shahani, AK; Moore, AR
err分享
err收藏
没有更多内容