摘要

摘要

En 中文
The application of computer vision in offsite construction for time data acquisition has proven valuable, but current methods pose a significant set-up burden. In the research presented in this paper, a computer vision -based process time data acquisition system (TiDA) for acquiring productivity-related data (productive time, cycle time, and process start-time) at the workstation level in panelized construction without the need for sig-nificant set-up efforts is proposed. The logic of the proposed system is demonstrated in reference to workstations on a wall production line in a lightweight wood panelized construction factory. Moreover, its promising per-formance is described in detail in a case application to framing operations in the factory. The mean absolute errors corresponding to the process start-time, productive time, and cycle time needed to frame 121 panels are found to be 0.72 min, 0.96 min, and 0.77 min per panel, respectively.
Keyword:
Computer vision
Object detection
Offsite construction
Artificial intelligence
Automated measurement
Process time
Productivity

期刊

Automation in Construction 封面图
Automation in Construction
IF:
11.5
论文数:
6.2K
被引数:
4.2W

机构

U
university of alberta
学者数:
5.1W
论文数: 4.9W
被引数: 65
U
University of British Columbia
学者数:
7.0W
论文数: 6.1W
被引数: 8.6W