Return
Constructability obstacles: an FCM-based dynamic modelling
DOI:10.1680/jinam.23.00020.png)
Abstract
En 中文
Construction projects often suffer cost/time overruns and reduced quality due to design-construction mismatches and lack of constructability. This dynamic process involves evolving variables requiring quantified, non-binary assessment to optimise buildability. This study identifies key obstacles to constructability implementation and models their interdependencies and impacts on project time, cost, and quality using fuzzy cognitive mapping (FCM). Based on literature, expert input, and an Iranian megaproject case study, a three-layer FCM with 28 obstacles, 10 consequences, and 3 failure modes was developed. Scenario analysis revealed critical barriers: viewing constructability as a cost rather than investment, contractors' unwillingness to engage in design, inflexible contracts, and limited contractor knowledge. Results enable targeted planning, early integration, and cultural shifts to reduce duplications, enhance effectiveness, and support constructability from initial design phases.
Keywords:
case study
constructability
constructability implementation
construction
construction management
FCM
fuzzy cognitive mapping
industry
innovation and infrastructure
obstacles
project management
sustainable cities and communities
UN SDG 9: Industry
UN SDG 11: Sustainable cities and communities
Journal
I
IF:
1.5
Papers:
19
Citations:
0

