CONSTRUCTION PHASE ORIENTED DYNAMIC SIMULATION: TAKING RCC DAM PLACEMENT PROCESS AS AN EXAMPLE
DOI:10.3846/jcem.2019.7948.png)
摘要
En 中文
Construction simulation has been widely applied in schedule analysis. However, traditional simulation is based on static models built in the planning or design phase, which focuses on overall project-level schedule analysis. To provide activity-level simulation for on-site schedule management, a construction phase oriented dynamic simulation method is proposed, which takes roller compacted concrete (RCC) dam placement process as an example. Considering various inner-layer and inter-layer activities and different construction organization modes, a detailed placement process simulation model is built. Based on construction data collected by real-time monitoring, a construction activity modeling method is given. Additionally, Dirichlet process mixture (DPM) models are applied for simulation parameter updates, which endows density estimation with considerable flexibility and robustness. A fast inference algorithm is also proposed to realize the fast posterior computation of DPM models. The proposed method is tested by an RCC dam project in southwest China. The results show that the proposed method can reflect the dynamic features of the actual placement process in the construction phase and provide accurate schedule predictions for on-site construction management.
Keyword:
construction phase
dynamic simulation
RCC dam
placement process
real-time monitoring
DPM models
期刊
J
IF:
7
论文数:
3.1K
被引数:
6.8K
机构
引用论文
Adaptive real-time tracking and simulation of heavy construction operations for look-ahead scheduling面向超前调度的重型施工作业自适应实时跟踪与仿真
Knowledge-Based Simulation Modeling of Construction Fleet Operations Using Multimodal-Process Data Mining使用多式联运过程数据挖掘的基于知识的建筑车队运营仿真建模