Construction project productivity evaluation framework with expanded system boundaries

delete2020-07-13
delete8
PRE
AI
W
Wenting Zhan
Wei Pan 封面图
Wei Pan (Wei Pan)
L
Le Chen *
DOI:10.1108/ECAM-12-2019-0691delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
Purpose While the investment in construction projects has increased over the past few decades, low construction project productivity (CPP) appeared to be persistent, thereby reflecting an investment-in-failure paradox between the investment and CPP. Hence, this paper aims to develop a systematic and holistic CPP evaluation framework to explain the apparent paradox in the construction industry. Design/methodology/approach The paper first reviews the literature about the theories of system, production, principal-agent and project success evaluation to re-conceptualise the CPP and proposes a two-stage CPP evaluation framework. The framework is subsequently explored through a sequential qualitative mixed-methods design within the context of the Hong Kong construction industry by combining 32 semi-structured interviews with senior industry experts and exploratory case studies, with three real-life construction projects. Findings The paper identifies three system boundaries for CPP evaluation, that is, parameter, timeframe and stakeholder, and develops a two-stage CPP evaluation framework to indicate site efficiency and utilisation effectiveness, thereby accessing the productivity of both the construction and post-construction stages. The investment-in-failure paradox associated with current CPP evaluation approaches is primarily attributed to the narrowly defined CPP boundaries. Research limitations/implications The qualitative exploration of the evaluation framework only focusses on the Hong Kong construction industry. Further case studies within other urban contexts could be used to improve the generalisability of the findings. Quantitative research is also necessary to advance theoretical development of the two-stage CPP evaluation. Practical implications The systemic CPP conceptualisation and the two-stage CPP evaluation framework support the systems thinking of industry stakeholders and enable them to formulate holistic strategies for long-term CPP enhancement. Originality/value The research demonstrates the needs to expand the system boundaries of CPP to reflect its systemic value and to shift the paradigm of CPP evaluation from being output-orientated and quantity-focussed to being outcome-orientated and value-focussed.
Keyword:
Productivity
Construction project productivity
Productivity evaluation
System boundaries
Systemic value
Hong Kong
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

J
Journal of Construction Engineering and Management
IF:
5.1
论文数:
5.1K
被引数:
1.4W

机构

U
University of Hong Kong
学者数:
4.1W
论文数: 3.9W
被引数: 10.1W
引用论文

引用论文

Saturation in qualitative research: exploring its conceptualization and operationalization定性研究中的饱和: 探索其概念化和可操作性
err2017-09-14
err0
errOAAI
errBenjamin Saunders; Julius Sim; Tom Kingstone; Shula Baker; Jackie Waterfield; Bernadette Bartlam; Heather Burroughs; Clare Jinks
err分享
err收藏
err分享
err收藏
学者 查看更多内容